The Institute is enriched with experienced engineers having expertise in field & academics from 4 to 40 years. The institute has got technical tie ups with reputed institution of the state. We provide consultancy services in the power Sector in the following domains.

CONSULTANCY SERVICES Power
  • Generation
  • Transmission
  • Distribution
  • Evacuation scheme
  • Evaluating Generator
  • Protection co-ordination
  • Design of inter-trip
  • Failure analysis
  • System operational support
  • Renewable Source of Energy including Co-Gen.

POWER SYSTEM Distribution
  • Load Forecasting (Long, Short term and day ahead scheduling for system operation)
  • Distribution Planning
  • Feeder/Asset Mapping
  • Energy Auditing & Accounting
  • A T& C computation
  • Protection co-ordination
  • ABT operation
  • Distribution Automation
  • Automation System

Industrial /Bulk Steel, Aluminum And Chemical And Consuming Industries
  • Evacuation plan for surplus power -CGP
  • Open access- LTOA/MTOA/STOA
  • Reactive Compensation
  • Network Design and Grid Connectivity Study
  • Protection Co-ordination
  • Insulation Co-ordination
  • Transient and Disturbance Analysis
  • Harmonic Analysis
  • Energy Conservation & DSM

Regulatory Affairs
  • In the matter of O, G.C compliance
  • Connection conditions
  • Operating Code.
  • Scheduling & dispatch
  • Metering, communication & data acquisition
  • Miscellaneous tech-legal issues fall under Regulatory frame work
  • In the matter of Distribution (condition of supply) code
  • In the matter of both Transmission & distribution interface
  • Energy Conservation & DSM

Distribution Automation (DA) Application of IT, control decisions executed in either automatic mode or in semiautomatic mode through
  • Network Generation: -Graphical representation, Editing, Validation, Bill board printing.
  • Monitoring: - System operating point data, Topological information,
  • Component specification:- Customization, Alarm generation (audio / video).
  • Control: - Switch control command, Control interl
  • Data Logging: - Logging of system operating point, Event log report, Report generation
  • System Information: - System quantities, % Unbalance in voltage and current, Component health , Circuit Breaker (CB) / Load Break Switch (LBS) / Isolator status, Remote / Local status, auto
  • Watchdog diagnostic and rectification tool
  • Admission open for 7th batch of 28 weeks training programme, classes will starts from 1st feburary 2012.
  • Advanced PC based Simulator Training course of 2Weeks duration avilable separately for the following.
  • Supercritical (700MW).
  • Subcritical (375MW).
  • Combined Cycle Plant.
  • 6th batch session for 26 weeks training programme will complete by end april 2012.
  • 5th batch session for 26 weeks training programme on Thermal Power Plant classes started on 1st July. This will end by end of january 2012
  • 4th batch of 26 Weeks training programme on O & M of Thermal Power Plant. Duration (01.12.2010 to 31.05.2011)
  • 3rd batch of 26 Weeks training programme on O & M of Thermal Power Plant. Duration (01.06.2010 to 27.11.2010)
  • 1st, 2nd, 3rd & 4th batch trainees have already been placed on job and 5th batch placement in progress.
  • OMS Power Training And Research Institute has recognition as category-I institute to provide training on Thermal, Hydro and Power Management from Central Electricity Authority (CEA) - Ministry of Power- Govt. of India.
  • Different onsite training programme were conducted by OMSPTRI at IB-Thermal Power Station to the employees of OPGC on the subjects of Boiler & Auxiliaries, Turbine & Auxiliaries, Electrical systems & Balance of Plants in January 2010.
  • A training programme was conducted by OMSPTRI at Monnet Power Plant, Anugul for a period of two week on the subject of Thermal Power plant in September & October 2011
  • onsite training programme was conducted by OMSPTRI for employees of LANCO during November 2011
  • onsite training programme was conducted by OMSPTRI for employees of Ms Navbharat Industries during October 2011
  • Vocational Training:-
  • 1st batch of Vocational Training (1 month) has been successfully completed in July 2009.
  • 2nd batch of Vocational Training (1 month) has been successfully completed in August 2009.
  • 3rd batch of Vocational Training (1 month) has been successfully completed on 14th July 2010.
  • 4th batch of Vocational Training (1 month) on Thermal Power Plant completed in September 2011.
  • Regular Evening Class Session available for working professionals in Non Power Sector.



  • OMS Power Training And Research Institute with its state of the art facilities including elegant class rooms, Wi-Fi environment, a well stacked library and up to date Web based training, has been recognized by the Central Electricity Authority (CEA), Ministry of Power, Govt. of India, (http://www.cea.nic.in/) for imparting advanced power plant training in line with the provisions of Indian Electricity Rule 1956 and Amended Rules 2005 to meet the power sector requirements.

    • Thermal Power Plant Training
    • Thermal Power Plant Refresher Course
    • Refresher Course on Indian Power Sector & Regulatory Affairs
    • Refresher Course on Power Plant Chemistry
    • Vocational Training
    • Need based Power Plant Training

    Books Download